Request for Completion of Work Letter

September 12, 2006

Engr. Ricardo Matic
JB Construction Company
Tondo, Manila

Dear Engr. Matic:

Be informed that we are waiting for the completion of the project Eunice house project so we can formally close out the project.

Here are the remaining punch list should be done first needed to rectify or complete the project based on house plan and specifications.

• Opening at the Front Door is only 80 cm instead of 90 cm as stated on the plan. (It was seen during the installation of door)
• Leak on the water line
• Cable and TV (ongoing installation)
• Rough Cement on the dirty kitchen (It should be smooth)

I hope for your cooperation regarding this matter.

Sincerely yours,

Madel de Lima
APL Project Engineer